2017
DOI: 10.5942/jawwa.2017.109.0054
|View full text |Cite
|
Sign up to set email alerts
|

Practical Considerations for Implementing Nitrosamine Control Strategies

Abstract: The US Environmental Protection Agency included five nitrosamines, including N‐nitrosodimethylamine (NDMA), on the fourth Contaminant Candidate List, indicating its consideration of these contaminants for potential regulatory determination. If nitrosamines are regulated, affected water systems and regulators will need to consider simultaneous compliance, risk balancing, operational, and cost impacts of implementing control strategies. This study showed that site‐specific data are lacking on the source(s) of ND… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2017
2017
2020
2020

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 35 publications
0
2
0
Order By: Relevance
“…Signatures of amine and amide precursors exist multiple watershed types, including urban and agricultural. Source water containing high concentrations of precursors is likely impaired by treated wastewater, industrial effluents, or herbicides diuron and dimethyldithiocarbamate [9][10][11][12][13].…”
Section: Nitrosamine Precursors In Source Watersmentioning
confidence: 99%
“…Signatures of amine and amide precursors exist multiple watershed types, including urban and agricultural. Source water containing high concentrations of precursors is likely impaired by treated wastewater, industrial effluents, or herbicides diuron and dimethyldithiocarbamate [9][10][11][12][13].…”
Section: Nitrosamine Precursors In Source Watersmentioning
confidence: 99%
“…WRF project #4491, Unintended Consequences of Implementing Nitrosamine Control Strategies (Russell et al forthcoming), focuses on identifying and documenting unintended consequences to provide practical guidance to water utilities and inform regulatory discussions. This project is discussed in “Practical Considerations for Implementing Nitrosamine Control Strategies” on page 32 of this issue of Journal AWWA (Russell et al 2017).…”
Section: Completed Focus Area Projectsmentioning
confidence: 99%