Abstract: Overcurrent relay plays an important role in the protection of power system. For protection, proper coordination of relays with an appropriate relay settings need to be done. Coordination can be done by selecting an optimal Time Multiplier Setting (TMS) and Plug Setting (PS) considering the fault current at the relay location. Continuous Time Intervals (CTI) must be maintained between primary relay and secondary relay to ensure correct sequential operation of the relays. However, miscoordination can occurs due… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
17
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 15 publications
(17 citation statements)
references
References 0 publications
0
17
0
Order By: Relevance
“…Time multiplier setting (TSM) is bounded between two value lower and upper bound to each relay, as well as pickup current setting (Ips) to each one depends on lower minimum fault current and max load current. According to the bounded value for TMS in equation (6) will be obtain the operating time in equation 1and (2).in this study according to IEC standard, normal inverse characteristic curve have been used with the following equation [4]:…”
Section: Tms and Pickup Current Setting Of Docrmentioning
confidence: 99%
See 1 more Smart Citation
“…Time multiplier setting (TSM) is bounded between two value lower and upper bound to each relay, as well as pickup current setting (Ips) to each one depends on lower minimum fault current and max load current. According to the bounded value for TMS in equation (6) will be obtain the operating time in equation 1and (2).in this study according to IEC standard, normal inverse characteristic curve have been used with the following equation [4]:…”
Section: Tms and Pickup Current Setting Of Docrmentioning
confidence: 99%
“…There are three sets of coordination problems between DR and DOCR should be determined. These parameter sets are starting current setting (Iset), time setting multiple (TSM set) in DOCR and timer of the second zone (TZ2 set) of DR [4,5].…”
Section: Introductionmentioning
confidence: 99%
“…Several simulation programs such as DIgSILENT and PSCAD are simulation programs that are widely used in research. Previous research [1][2][3][4][5][6][7][8][9][10][11][12][13][14][15][16][17][18][19][20] had used PSCAD software and [21][22][23][24][25][26] DIgSILENT Power Factory is used to record data handling, to build modelling capabilities and minimizing project execution costs and training. So, DIgSILENT is one of the simulation program which helpful for power flow analysis, wind power, industrial grids and distributed generation in terms of application of new technologies.…”
Section: Introductionmentioning
confidence: 99%
“…PSCAD can conduct studies about how to measure the voltage magnitude and angle in a power system due to a lightning strike. PSCAD also one of the simulation program which able to record the real time data or signal in in nanoseconds [1][2][3][4][5][6][7][8][9][10][11][12][13][14][15][16][17][18][19][20].…”
Section: Introductionmentioning
confidence: 99%
“…ANN method also able to modeling energy consumption for random day and the next hours by using Boolean metering system [20][21]. The application of ANN has some advantages such as the following: the mapping function in neural network is very flexible and neural network have the ability of generalizing form a limit set of data points and giving a good result at new data points [22][23].…”
mentioning
confidence: 99%