Proceedings of the 12th IEEE Mediterranean Electrotechnical Conference (IEEE Cat. No.04CH37521) 2004
DOI: 10.1109/melcon.2004.1348081
|View full text |Cite
|
Sign up to set email alerts
|

Process information model for transmission system operator following IEC model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2008
2008
2008
2008

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…C order of all primary and secondary equipment (breakers, disconnectors, voltage controllers, relay protection, telecommunication equipment, equipment for process supervision and control, measuring equipment, etc. ), and the signals for protection operation [1]- [3]. Fig.…”
Section: A Device Modelmentioning
confidence: 99%
“…C order of all primary and secondary equipment (breakers, disconnectors, voltage controllers, relay protection, telecommunication equipment, equipment for process supervision and control, measuring equipment, etc. ), and the signals for protection operation [1]- [3]. Fig.…”
Section: A Device Modelmentioning
confidence: 99%