2022
DOI: 10.1007/s00170-022-09078-3
|View full text |Cite
|
Sign up to set email alerts
|

Production, maintenance and quality inspection planning of a hybrid manufacturing/remanufacturing system under production rate-dependent deterioration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 14 publications
(1 citation statement)
references
References 38 publications
0
0
0
Order By: Relevance
“…The following factors prefer outsourcing: a more significant market potential, higher clients' environmental awareness, and a longer distance between the outsourcer and producer. Other studies (Eiamkanchanalai and Banerjee, 1999;Osei-Bryson and Ngwenyama, 2006;Ameknassi et al, 2016;Chiu et al, 2021;Chiu et al, 2022b;Gambal et al, 2022;Megoze Pongha et al, 2022;Bernard and Mitraille, 2023;Karamemis et al, 2023) explored the effects of various contracting-out policies and expedited fabrication rates on manufacturing and supply-chain systems' uptime-reduction, optimization, control, and operations management. Lacking past works specifically optimizing the hybrid multi-item fabricating-shipping integrated system considering scrap, adjustable rate, and postponement, this work aims to fill the gap.…”
Section: Introductionmentioning
confidence: 99%
“…The following factors prefer outsourcing: a more significant market potential, higher clients' environmental awareness, and a longer distance between the outsourcer and producer. Other studies (Eiamkanchanalai and Banerjee, 1999;Osei-Bryson and Ngwenyama, 2006;Ameknassi et al, 2016;Chiu et al, 2021;Chiu et al, 2022b;Gambal et al, 2022;Megoze Pongha et al, 2022;Bernard and Mitraille, 2023;Karamemis et al, 2023) explored the effects of various contracting-out policies and expedited fabrication rates on manufacturing and supply-chain systems' uptime-reduction, optimization, control, and operations management. Lacking past works specifically optimizing the hybrid multi-item fabricating-shipping integrated system considering scrap, adjustable rate, and postponement, this work aims to fill the gap.…”
Section: Introductionmentioning
confidence: 99%