1968
DOI: 10.1007/978-1-4684-6459-7
|View full text |Cite
|
Sign up to set email alerts
|

Protective Relays

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0
1

Year Published

2005
2005
2021
2021

Publication Types

Select...
5
3
2

Relationship

0
10

Authors

Journals

citations
Cited by 59 publications
(6 citation statements)
references
References 0 publications
0
5
0
1
Order By: Relevance
“…Setelan waktu kerja relai arus labih standart inverse didapat dengan menggunakan rumus kurva waktu dan arus [5], [6] Berdasarkan gambar 4.8, perbedaan seting relai OCR sisi incoming antara data dan hasil perhitungan sama, tms berdasarkan data = 0,201 dan waktu kerja = 0,7 detik. Berdasarkan analisa tms = 0,195 dan waktu kerja = 0,7 detik.…”
Section: Penyetelan Waktu Kerja Relaiunclassified
“…Setelan waktu kerja relai arus labih standart inverse didapat dengan menggunakan rumus kurva waktu dan arus [5], [6] Berdasarkan gambar 4.8, perbedaan seting relai OCR sisi incoming antara data dan hasil perhitungan sama, tms berdasarkan data = 0,201 dan waktu kerja = 0,7 detik. Berdasarkan analisa tms = 0,195 dan waktu kerja = 0,7 detik.…”
Section: Penyetelan Waktu Kerja Relaiunclassified
“…The largest errors are usually caused by the fault resistance, however. In the case of power arc, this can be calculated as follows [4]:…”
Section: Performance Of the Fault Location Systemmentioning
confidence: 99%
“…In this works of art streamlining methods are executed for most appropriate co-appointment of directional overcurrent transfers. This theory talks about the use of Particle Swarm Optimization (PSO) calculation for most worthwhile coordination of DOCR transfers in a 8 bus power [2] machine system. Blend of essential and reinforcement hand-off is chosen by means of the utilization of far and close stop vector of shape, to maintain a strategic distance from miscoordination of transfers.…”
Section: Introductionmentioning
confidence: 99%