2018 European Frequency and Time Forum (EFTF) 2018
DOI: 10.1109/eftf.2018.8409054
|View full text |Cite
|
Sign up to set email alerts
|

Real like transmission lines for sagnac correction study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…In the existing time-frequency synchronization scheme, satellite timing has become the primary way with the advantages of a wide range and flexible access, but it has obvious security risks because of the weak signal, which is easy to interfere with. For the sake of national defense security, the US Department of Defense began to plan the construction of national integrated Positioning, Navigation, and Timing (PNT) in 2010 [10][11][12]. It would develop various timing methods for cooperation to make up for the defects of any single system and make PNT more perfect [13,14].…”
Section: Introductionmentioning
confidence: 99%
“…In the existing time-frequency synchronization scheme, satellite timing has become the primary way with the advantages of a wide range and flexible access, but it has obvious security risks because of the weak signal, which is easy to interfere with. For the sake of national defense security, the US Department of Defense began to plan the construction of national integrated Positioning, Navigation, and Timing (PNT) in 2010 [10][11][12]. It would develop various timing methods for cooperation to make up for the defects of any single system and make PNT more perfect [13,14].…”
Section: Introductionmentioning
confidence: 99%