2017
DOI: 10.1016/j.aei.2016.12.003
|View full text |Cite
|
Sign up to set email alerts
|

Recognition of process patterns for BIM-based construction schedules

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
37
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
4
4

Relationship

1
7

Authors

Journals

citations
Cited by 59 publications
(37 citation statements)
references
References 39 publications
0
37
0
Order By: Relevance
“…Suggestions for future research on 4D BIM acceptance in complex construction projects with abundant data and alternative models are provided. construction plans and generate construction process patterns to assist construction managers [7] and further contribute to the project knowledge codification and personalization [8].Previous studies on BIM application in EPC projects mainly focused on: (1) How to enhance BIM performance in EPC projects [9]; (2) how to promote the performance of EPC projects through applying BIM [10]. But less attention was paid to the technology acceptance process of BIM.…”
mentioning
confidence: 99%
See 1 more Smart Citation
“…Suggestions for future research on 4D BIM acceptance in complex construction projects with abundant data and alternative models are provided. construction plans and generate construction process patterns to assist construction managers [7] and further contribute to the project knowledge codification and personalization [8].Previous studies on BIM application in EPC projects mainly focused on: (1) How to enhance BIM performance in EPC projects [9]; (2) how to promote the performance of EPC projects through applying BIM [10]. But less attention was paid to the technology acceptance process of BIM.…”
mentioning
confidence: 99%
“…Suggestions for future research on 4D BIM acceptance in complex construction projects with abundant data and alternative models are provided. construction plans and generate construction process patterns to assist construction managers [7] and further contribute to the project knowledge codification and personalization [8].…”
mentioning
confidence: 99%
“…As a result, much research has been investigated how schedule generation could be enhanced by automating generation of activity, estimation of duration and determining sequence logic with the support of emerging technologies. For this, BIM is increasingly an important for scheduling since it provides a significant support for this complex task by reducing planning time and increase productivity (Sigalov & König, 2017). Sigalov and König (2017) developed automatic detection of construction processes patterns with an emphasis on preparation of schedules for the recognition of process patterns, including breakdown of schedules into smaller parts.…”
Section: Integrating Emerging Schedule Technologiesmentioning
confidence: 99%
“…For this, BIM is increasingly an important for scheduling since it provides a significant support for this complex task by reducing planning time and increase productivity (Sigalov & König, 2017). Sigalov and König (2017) developed automatic detection of construction processes patterns with an emphasis on preparation of schedules for the recognition of process patterns, including breakdown of schedules into smaller parts. Moreover, various types of spaces can be represented within 4D CAD simulation model that are required by activities in the site across their scheduled time.…”
Section: Integrating Emerging Schedule Technologiesmentioning
confidence: 99%
“…At the same time, BIM can also be used as a collaborative design platform for information sharing to solve the interoperability of design software data of different disciplines problem for achieving real collaborative design [20]. BIM can not only make and control the construction schedule [21,22], but can also guide the specific construction technology operation. For example, BIM is used to guide the construction of formwork [23] and concrete pouring [24].…”
mentioning
confidence: 99%