“…To control the active and reactive power at the output of the converter, correct and reliable synchronisation with the distribution grid is required (Blaabjerg et al, 2006). For the purpose of synchronization, it has been proposed to use the DDSRF-PLL algorithm (Jarzyna, 2019;Jarzyna et al, 2020;Nicastri and Nagliero, 2010;Rodriguez et al, 2007;Silva et al, 2004), which operates on the basis of feedback, thereby ensuring that it is able to provide a synchronisation signal with high quality parameters even in case of strong disturbances occurring in the utility grid (Jarzyna et al, 2017). A sawtooth synchronisation signal assuming values in the range <0, 2π> is converted into a sine wave reference signal of amplitude 1.…”