Regenerative Testing of a Concentrated-Winding Permanent-Magnet Synchronous Machine for Offshore Wind Generation—Part II: Test Implementation and Results

Abstract: The on-load factory testing of high-power electric machines may be a challenge due to the large mechanical equipment required to drive or load them. In a companion paper, a regenerative full-load testing strategy has been proposed, where the power flows in a closed loop between the electric machine and a dual-stage converter so that only the power corresponding to system losses needs to be supplied by the test facility and no mechanical equipment is needed. In this paper, the implementation of such testing str… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
32
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
4
4

Relationship

2
6

Authors

Journals

citations
Cited by 26 publications
(32 citation statements)
references
References 9 publications
0
32
0
Order By: Relevance
“…13(e)] will be compared with measurements collected during the actual machine regenerative test [14].…”
Section: B Calculation Of Steady-state Performancementioning
confidence: 99%
See 2 more Smart Citations
“…13(e)] will be compared with measurements collected during the actual machine regenerative test [14].…”
Section: B Calculation Of Steady-state Performancementioning
confidence: 99%
“…For the check, the currents (14) are assigned to the phases of generating sections S1 and S3, while currents (15) are assigned to the three phases of motoring sections S2 and S4…”
Section: B Check Through Fe Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…The concept was successfully applied to permanent magnet (PM) machines, with the validity demonstrated on a six-phase [5] and a nine-phase machine [6], [7]. The approach was further found to be very useful in devising regenerative testing methods for machines with multiple three-phase windings, as detailed for twelve-and six-phase PM machines in [8], [9] and [10], respectively. The concept was also tested on multiphase induction machines (IMs).…”
Section: Introductionmentioning
confidence: 99%
“…A new approach for testing the machine's full-load capabilities is introduced in [18,19]. The approach is capable of loading the machine and re-circulating the power simultaneously.…”
Section: Introductionmentioning
confidence: 99%