2006
DOI: 10.1109/tpwrs.2006.881128
|View full text |Cite
|
Sign up to set email alerts
|

Reliability Constrained Unit Commitment Using Simulated Annealing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
93
0
5

Year Published

2007
2007
2020
2020

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 121 publications
(99 citation statements)
references
References 21 publications
1
93
0
5
Order By: Relevance
“…24 hours) [1]. The classical single-objective UCP aims at minimizing the total operational costs of all generation units, given a number of equality constraints (e.g.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…24 hours) [1]. The classical single-objective UCP aims at minimizing the total operational costs of all generation units, given a number of equality constraints (e.g.…”
Section: Introductionmentioning
confidence: 99%
“…Li and E. Zio cost [1,12,[14][15][16]19]. On the other hand, the increasing awareness of environmental protection is pushing the utilities to improve their design and operational strategies, for reducing the emissions from the power plants [20].…”
Section: Introductionmentioning
confidence: 99%
“…The conventional generating units can be modeled as a two state model for the reliability evaluation [14]. But, two state model is not suitable to reliability evaluation of solar cell generator (SDG) due to unstable solar radiation.…”
Section: Solar Radiation Modelmentioning
confidence: 99%
“…The proposed algorithm is relatively fast and provides feasible nearoptimal solutions. A new method for the incorporation of the unit unavailability and the uncertainty of the load forecast in the solution of the short-term UC solved by the SA was presented in (Simopoulos et al, 2006b). The required spinning reserve capacity was conducted by imposing reliability constraints, based on the expected unserved energy and the loss of load probability indices.…”
Section: Generator Maintenance Scheduling and Unit Commitmentmentioning
confidence: 99%