Third International Interactive Symposium on Ultra-High Performance Concrete 2023
DOI: 10.21838/uhpc.16646
|View full text |Cite
|
Sign up to set email alerts
|

Renewal of the Fixed Railway Track in Zurich Airport Station by Means of Blocks in UHPFRC

Abstract: This contribution presents a probably worldwide first application of UHPFRC for the renewal of an existing fixed railway track in a heavily trafficked underground railway station. The existing fixed railway track of the Zurich Airport train station was constructed in 1980. It consists of four 640 m (700 yards) long tracks constructed as slabs in concrete. According to the state-oftechnology at that time, the fixed railway track was built as a reinforced concrete slab and prefabricated monoblocs of the LVT L77-… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles