Research on Deformation Characteristics of Tunnel Box Culvert Structure under Different Construction Loads

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…e overall tunnel excavation cycle is as follows: excavate one meter forward ⟶ remove the supporting force of the previous step ⟶ apply the supporting force of the present stage⟶ release the xed soil displacement within the range of the shield machine at the last step ⟶ control the soil displacement within the range of the shield machine at the present stage to form a conical shape of the shield machine ⟶ apply grouting pressure within the range of 0-1 m at the current stage of shield tail ⟶ remove the grouting pressure applied at the last step, that is, the range of 1-2 m behind the current stage of shield tail ⟶within the range of grouting pressure removal, the lining unit and grouting unit are installed [17]. e cycle continues until the whole tunnel excavation is completed, which is 60 meters in this essay.…”
Section: Re Ned Modeling Stepsmentioning
confidence: 99%
“…e overall tunnel excavation cycle is as follows: excavate one meter forward ⟶ remove the supporting force of the previous step ⟶ apply the supporting force of the present stage⟶ release the xed soil displacement within the range of the shield machine at the last step ⟶ control the soil displacement within the range of the shield machine at the present stage to form a conical shape of the shield machine ⟶ apply grouting pressure within the range of 0-1 m at the current stage of shield tail ⟶ remove the grouting pressure applied at the last step, that is, the range of 1-2 m behind the current stage of shield tail ⟶within the range of grouting pressure removal, the lining unit and grouting unit are installed [17]. e cycle continues until the whole tunnel excavation is completed, which is 60 meters in this essay.…”
Section: Re Ned Modeling Stepsmentioning
confidence: 99%
“…Its concrete realization is as follows: the finite in-situ stress data is obtained by hydraulic fracturing method, and the initial in-situ stress state is obtained by inversion and regression; During the construction period, the rock samples near the tunnel face are selected for laboratory tests to obtain the compressive strength of rock masses of various sections, and the bedding dip angle and groundwater development are observed and recorded. According to the classification scheme of large deformation (as shown in Table 2), the actual large deformation on site can be divided into three grades: slight, medium and strong [15][16][17] . At this point, the one-to-one correspondence relationship between the strength of surrounding rock, the structure type of surrounding rock, the size of in-situ stress, the development of groundwater and the site large deformation grade of each section is established, and a complete learning sample is obtained.…”
Section: Convolutional Neural Network Prediction Methods For Large De...mentioning
confidence: 99%
“…These sensors were able to detect and measure strain and stress on the culvert in order to monitor structural health via the stress–strain measurement [ 25 ]. Additionally, recent work has been focused on reducing the effects of load on box culverts under different loads of construction such as culverts near tunnels or next to train tracks [ 26 , 27 , 28 ].…”
Section: Introductionmentioning
confidence: 99%