2022
DOI: 10.3390/en15124252
|View full text |Cite
|
Sign up to set email alerts
|

Research on Directional Controllability of Cracking in Hydraulic Fracturing of Hard Overburden Based on Local Stress Field Intervention

Abstract: As a widely-used method of digging roadways in China, gob-side entry driving features specific advantages, such as a high recovery rate and good isolation effects. However, under the condition of hard overburden, the excessive bearing pressure of small coal pillars will easily cause serious internal damage in the coal and the run-through of the plastic zone, leading to harmful gas leakage in the goaf. Therefore, based on the engineering background of small coal pillars in the 18506 working face of Xiqu Coal Mi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 25 publications
0
2
0
Order By: Relevance
“…To prevent water inrush disasters, it is common practice in mine development to leave a certain width of coal pillars between adjacent working faces, as shown in Fig. 2, to block the accumulation of water in the gob (Wang et al 2021;Chen et al 2022a;Galav et al 2022;He and Huang 2022;Fang et al 2023). The stability of these waterproof coal pillars has long been one of the critical research topics in coal mine development (Wang 2006;Hu et al 2019;Li et al 2021;He et al 2023).…”
Section: Introductionmentioning
confidence: 99%
“…To prevent water inrush disasters, it is common practice in mine development to leave a certain width of coal pillars between adjacent working faces, as shown in Fig. 2, to block the accumulation of water in the gob (Wang et al 2021;Chen et al 2022a;Galav et al 2022;He and Huang 2022;Fang et al 2023). The stability of these waterproof coal pillars has long been one of the critical research topics in coal mine development (Wang 2006;Hu et al 2019;Li et al 2021;He et al 2023).…”
Section: Introductionmentioning
confidence: 99%
“…16,17 However, it is very difficult to control the narrow coal pillar stability under high-stress conditions when drilling along the goaf. 18 To improve the narrow coal pillar stability, control technologies such as rational coal pillar width, 19 roof cutting pressure relief, [20][21][22][23][24] and strengthened support 25 have been proposed. There are also joint applications of multiple technologies.…”
Section: Introductionmentioning
confidence: 99%