Research on Irregular Block Spatial Scheduling Algorithm in Shipbuilding

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 6 publications
0
4
0
Order By: Relevance
“…Later, Li et al [9] included block arrangement sorting as the first step and then applied the genetic algorithm to solve the spatial scheduling problem. Zhang and Ci [10] introduced a hybrid spatial scheduling algorithm based on a genetic algorithm and simulated the annealing algorithm. Yang et al [11] proposed an improved multiobjective particle swarm optimization to solve uncertainty in the shipbuilding scheduling problem.…”
Section: Methods and Applications Of Spatial Scheduling In The Shipbu...mentioning
confidence: 99%
See 1 more Smart Citation
“…Later, Li et al [9] included block arrangement sorting as the first step and then applied the genetic algorithm to solve the spatial scheduling problem. Zhang and Ci [10] introduced a hybrid spatial scheduling algorithm based on a genetic algorithm and simulated the annealing algorithm. Yang et al [11] proposed an improved multiobjective particle swarm optimization to solve uncertainty in the shipbuilding scheduling problem.…”
Section: Methods and Applications Of Spatial Scheduling In The Shipbu...mentioning
confidence: 99%
“…Equation (9) indicates that all blocks must be processed after their earliest starting time. Equation (10) indicates that the final time of block is equal to the real start time plus the processing time. Equation (11) indicates that at most one block can be processed at the same time.…”
Section: Constraint Condition For the Block Workhop Spatial Schedulingmentioning
confidence: 99%
“…Considering the constraints of the availability of two-dimensional space resources and the priority relationship between tasks, Hu [3] et al constructed a spatiotemporal collaborative scheduling model for segment construction with the goal of minimizing the maximum completion time of the project. Zhang and Ci [2] discussed the spatiotemporal coscheduling problem of irregular segments, by specifying the segment processing sites at the same time to determine the optimal scheduling and workshop layout of a set of irregular segments, and using a two-dimensional mean grid to describe workspace and irregular segments. The above research focuses on the analysis of the spatiotemporal system under ideal conditions, and does not introduce the factor of labor deployment.…”
Section: Theoretical and Practical Research On Segment Outfitting Schemementioning
confidence: 99%
“…The segment outfitting accounts for about 35% of the outfitting of the whole ship, which has an important impact on the efficiency and cycle of ship construction. Segment outfitting mainly refers to the installation of facilities, such as pipes, electromechanical equipment and wires, after the ship fabricated in segments [2] . The traditional segment outfitting arranges operations based on experience, which relies on the manual operation with flatbed transporters, forklifts and other equipment to transport ship segments and pallets of outfitting parts to the storage yard, lacking effective collaborative scheduling tools, as shown in Figure 1.…”
Section: Introductionmentioning
confidence: 99%