2022
DOI: 10.1371/journal.pone.0265087
|View full text |Cite
|
Sign up to set email alerts
|

Research on the factors of extremely short construction period under the sufficient resources based on Grey-DEMATEL-ISM

Abstract: Under the condition of sufficient resources, there are many factors affecting the realization of extremely short construction period of engineering construction projects. Based on literature review and questionnaire survey, this paper firstly selected 17 influencing factors from the five dimensions of design, management, technology, policy and environment. And the factor analytic hierarchy process model was established based on Grey-DEMATEL-ISM. The model introduced the improved grey system theory and combined… Show more

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(7 citation statements)
references
References 64 publications
0
3
0
Order By: Relevance
“…The main principle of DEMATEL is to build a direct impact matrix and a comprehensive impact matrix by analyzing the causal relationship between various influencing factors in the system, determine the centrality and cause degree, and simplify the complex relationship (Gani et al, 2022). ISM is a structural modeling algorithm that studies the relationship between the influence and the affected of various elements in a complex system, clearly reflects the internal structure of the system, and uses directed graphs and matrices to discover the main factors and their internal relations (Peng et al, 2022). These two algorithms can complement each other.…”
Section: Existing Research Methods For Influencing Factors Of Scrmentioning
confidence: 99%
See 1 more Smart Citation
“…The main principle of DEMATEL is to build a direct impact matrix and a comprehensive impact matrix by analyzing the causal relationship between various influencing factors in the system, determine the centrality and cause degree, and simplify the complex relationship (Gani et al, 2022). ISM is a structural modeling algorithm that studies the relationship between the influence and the affected of various elements in a complex system, clearly reflects the internal structure of the system, and uses directed graphs and matrices to discover the main factors and their internal relations (Peng et al, 2022). These two algorithms can complement each other.…”
Section: Existing Research Methods For Influencing Factors Of Scrmentioning
confidence: 99%
“…If expert 1 scores x 12 as 3 points, then in the corresponding gray number matrix X1, x 12 = [0.5, 0.75], and note that the interval gray numbers on the diagonal are all [0, 0]. (2) Based on the comprehensive consideration of the different research fields and research levels of experts, the different degrees of mastery of the research fields, reference resources (Peng et al, 2022) gives each expert fuzzy interval gray weight according to the importance of experts, and the weight semantic scale is shown in Use formula (1) to calculate the upper and lower limits of the standardized gray number.…”
Section: Establishment Of Gray Direct Relation Matrixmentioning
confidence: 99%
“…In addition, the choice of forecasting tools, the effect of cognitive uncertainty, contractor management capability, frequent design changes and initial over-optimism on the part of the owner can also affect construction duration (Ahmadu et al, 2020;Velumani et al, 2021;Doloi et al, 2012). Understanding the interrelationships and the degree of influence of the factors affecting the duration can help decision makers and managers of construction projects to effectively master the key factors with sufficient resources (Peng et al, 2022). However, not every factor has an important influence on the construction period, so before establishing the prediction model, it is necessary to select specific factors affecting the construction period as the input of the model, and get the output results after the model processing.…”
Section: Selection Of Indicatorsmentioning
confidence: 99%
“…Therefore, even under the condition of sufficient resources, there is still a problem of rational allocation of resources. Peng et al (2022) studied the factors affecting the extremely short construction period under the condition of the sufficient resources, and investigated the effective key factors that promote the success of the project. The success of construction largely projects depends on the appropriate management of human resources (Dabirian et al, 2019).…”
Section: Review Of Literaturementioning
confidence: 99%