This paper reports the dewatering scheme of a deep excavation in sandy pebble strata. The excavation is in high permeability strata and is close to the Yellow River, making the dewatering difficult during construction. At present, few researchers have specially studied the dewatering scheme of deep excavations in strong permeable strata near the water resource. Field pumping test was conducted before the excavation activity, and the permeability coefficient of the strata was obtained by reverse analysis. According to the characteristics of the project, the dewatering scheme of “
waterproof
curtain
+
base
grouting
+
pumping
” was proposed. The influence of vertical waterproof curtain and base grouting on dewatering was analyzed by numerical simulation. In the construction process, the field water table and ground settlement were measured. The results show that (1) the groundwater table versus permeability coefficient curve shows three different stages and (2) the dewatering scheme of “
waterproof
curtain
+
base
grouting
+
pumping
” is effective for deep excavation in strong permeable strata.