2017
DOI: 10.1088/1757-899x/236/1/012061
|View full text |Cite
|
Sign up to set email alerts
|

Reserves in load capacity assessment of existing bridges

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…It will also be necessary to design possible structural solutions that would ensure such unconventional fixing of ribbon track is safe, durable and can ensure the required track speed of 120 km/h. The application of current principles of bridge evaluation [2,3,4] and the use of advanced models combining numerical and experimental analysis can lead into satisfactory result, [5]. The rail truck-structure interaction is complex task which need this type of complex approach, [6,7].…”
Section: Introductionmentioning
confidence: 99%
“…It will also be necessary to design possible structural solutions that would ensure such unconventional fixing of ribbon track is safe, durable and can ensure the required track speed of 120 km/h. The application of current principles of bridge evaluation [2,3,4] and the use of advanced models combining numerical and experimental analysis can lead into satisfactory result, [5]. The rail truck-structure interaction is complex task which need this type of complex approach, [6,7].…”
Section: Introductionmentioning
confidence: 99%