Restoration of an Active MV Distribution Grid with a Battery ESS: A Real Case Study

Abstract: In order to improve power system operation, Battery Energy Storage Systems (BESSs) have been installed in high voltage/medium voltage stations by Distribution System Operators (DSOs) around the world. Support for restoration of MV distribution networks after a blackout or HV interruption is among the possible new functionalities of BESSs. With the aim to improve quality of service, the present paper investigates whether a BESS, installed in the HV/MV substation, can improve the restoration process indicators o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
4
0
3

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 9 publications
(7 citation statements)
references
References 27 publications
0
4
0
3
Order By: Relevance
“…Moreover, the application of BESS for black-start was validated using a real case study of an Italian MV distribution grid in Manganelli et al (2018). The effectiveness of BESS for black-start in distribution grids was demonstrated using different scenarios; BESS in coordination with distributed generators and BESS alone.…”
Section: Black-startmentioning
confidence: 99%
“…Moreover, the application of BESS for black-start was validated using a real case study of an Italian MV distribution grid in Manganelli et al (2018). The effectiveness of BESS for black-start in distribution grids was demonstrated using different scenarios; BESS in coordination with distributed generators and BESS alone.…”
Section: Black-startmentioning
confidence: 99%
“…The penetrations of a large-scale and centralized power system associated with high RESs/DGs production are highly variable and volatile and there have been issues with decreasing stability and reliability. Therefore, to cope with the volatility of RESs/DGs and to improve the stability margin of the power system in the past few years, a microgrid [1][2][3][4][5][6][7] and an active distribution network (ADN) [8][9][10] have been proposed to make the power system network more active and flexible by integrating RESs/DGs and some intelligent controls for RESs/DGs and loads in the decentralized schemes. Nevertheless, the microgrid has focused mainly on managing a small-scale distribution system and loads compared to a larger-scale ADN.…”
Section: Introductionmentioning
confidence: 99%
“…The BESS implementation on the ADN from low-voltage to medium-voltage applications has many advantages [10,31,32]. Therefore, researchers have been increasingly interested in applying the frequency stability improvements using the BESS to the ADN system.…”
Section: Introductionmentioning
confidence: 99%
“…This makes ESS suitable for providing a black start service. Case studies of black start services of ESSs in medium voltage distribution networks are discussed in Manganelli et al [11]. Further, upgrades of transmission and distribution network facilities can be deferred through ESS installation [12][13][14].…”
Section: Introductionmentioning