“…Whereas in terms of field conditions, there is a level of disturbance permitted, the presence of hazardous materials, environmental risks and the location of the structure [2,4,8,9,[11][12][13][14]. In addition, there are costs that must be safe and financially feasible [6,9,10,[13][14][15] and prior experience is needed as seen from the limits given by the client, structural engineer needs resources, transportation considerations [4,6,9,[11][12][13][14]. Meanwhile, in term of time, demolition in general must be conducted as quickly as possible [6,8,9,10,13,15], and the value of the materials to be recycled will be higher and better [6,9,10,14,15] The choice of demolition method is very important because it will have a serious impact and safety, recycle of materials and components and costs.…”