2021
DOI: 10.1088/1742-6596/1838/1/012043
|View full text |Cite
|
Sign up to set email alerts
|

Review on Seismic Behavior of Precast Bridge Column with Socket Connections

Abstract: Accelerated bridge construction (ABC) technology has been widely used due to its many advantages. However, the lack of well-developed and engineering proven connection details have limited the use of prefabricated substructures in seismic zones. The socket connection is one of many different ways of connecting precast substructure, which is characterized by convenient transportation and simple construction. This paper introduces the socket connections of precast bridge columns and reviews it from those aspects… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 15 publications
0
2
0
Order By: Relevance
“…21,22 Compared to other connections, the socket connection requires a lower construction accuracy and is convenient for construction. 23 The socket connection is a method to achieve the connection between the precast members by inserting the precast member into the socket left in the footing or other members. According to the structural details of the socket connection, the embedment length is one of the critical parameters that could significantly influence the seismic performance of the socket connections.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…21,22 Compared to other connections, the socket connection requires a lower construction accuracy and is convenient for construction. 23 The socket connection is a method to achieve the connection between the precast members by inserting the precast member into the socket left in the footing or other members. According to the structural details of the socket connection, the embedment length is one of the critical parameters that could significantly influence the seismic performance of the socket connections.…”
Section: Introductionmentioning
confidence: 99%
“…Compared to other connections, the socket connection requires a lower construction accuracy and is convenient for construction 23 . The socket connection is a method to achieve the connection between the precast members by inserting the precast member into the socket left in the footing or other members.…”
Section: Introductionmentioning
confidence: 99%