2015
DOI: 10.17265/1934-7359/2015.06.002
|View full text |Cite
|
Sign up to set email alerts
|

Risk Analysis for Mega Shopping Mall Projects in Egypt

Abstract: Mega shopping mall projects have seen dramatic growth and great development in recent years in Egypt. Many new mega shopping mall projects are under construction and expecting to start working in the few coming years. In the absence of researches studying the Egyptian mega shopping mall projects, this study tries to highlight the most critical risks that face these projects and the associated most effective response methods to be employed. The scope covers the analysis from different perspectives by including … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 2 publications
0
5
0
Order By: Relevance
“…The type of data collection tool is subject to various factors including the nature and method of the research. Questionnaire was selected as the data collection tool in this research, similar to other studies (Chan et al , 2014; Ezeldin and Ibrahim, 2015; Sarvari et al , 2019a). The questionnaire was designed based on the initial RBS, which is mainly based on past research and library studies, and it was used to identify and document the risks of CRCBPs – using the Delphi technique as one of the most common methods of risk identification (Rostami, 2016; Sarvari et al , 2019b; Siraj and Fayek, 2019).…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The type of data collection tool is subject to various factors including the nature and method of the research. Questionnaire was selected as the data collection tool in this research, similar to other studies (Chan et al , 2014; Ezeldin and Ibrahim, 2015; Sarvari et al , 2019a). The questionnaire was designed based on the initial RBS, which is mainly based on past research and library studies, and it was used to identify and document the risks of CRCBPs – using the Delphi technique as one of the most common methods of risk identification (Rostami, 2016; Sarvari et al , 2019b; Siraj and Fayek, 2019).…”
Section: Methodsmentioning
confidence: 99%
“…In particular, these scholars identified risks and prioritized them based on a sensitivity analysis and a hybrid modelbased on the Analytic Network Process (ANP) method (i.e., a model that structures decisionmaking processes as a network)that addressed the shortcomings of previous methods. In another study, Ezeldin and Ibrahim (2015) conducted risk analysis of a large CRCBP through a questionnaire distributed in Egypt and identified 30 risks, which were classified into six main categories. As a result, they found that the lack of financing, changes in design, incomplete specifications, and the lack of owner liquidity were the most important risks.…”
Section: Risk Identification and Classification In Crcbpsmentioning
confidence: 99%
“…The risk identification step aimed to record the details of the uncertainties before the occurrence of risks. In the present study, after identifying the various risks of CRCBPs based on the study of research literature (e.g., [5,16,24,31,64,70,76]), the relevance of the identified risks was evaluated and monitored. Finally, based on three rounds of the Delphi technique, 82 risks of CRCBPs were identified and recorded; see Tables 3 and 4, respectively, for internal and external risks.…”
Section: Results Of Delphi Surveymentioning
confidence: 99%
“…Table 1 shows the demographic data of the experts participating in the Delphi process. In this study, 53 construction risks-classified into 14 categories-of CRCBPs were identified based on a detailed and comprehensive literature review (e.g., [5,16,24,31,64]). Table 2 outlines the risks affecting the objectives of CRCBPs and categorizes them into internal and external risks as well as grouping them into 14 clusters at the second level (i.e., social, economic, political, legal, natural, technical, work force, investment, management, safety, design, contract, market and environmental) and 53 risks at the third level.…”
Section: Delphi Survey Techniquementioning
confidence: 99%
See 1 more Smart Citation