2013 IEEE Innovative Smart Grid Technologies-Asia (ISGT Asia) 2013
DOI: 10.1109/isgt-asia.2013.6698756
|View full text |Cite
|
Sign up to set email alerts
|

Robust and economical placement of phasor measurement units in Indian Smart Grid

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2014
2014
2019
2019

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 15 publications
0
4
0
Order By: Relevance
“…An algorithm for intentional islanding of a power grid satisfying various islanding constraints was presented in [2], [3]. However the algorithm is not applicable to all networks and failed to keep the islands observable in some cases, as shown in the present paper.…”
Section: Introductionmentioning
confidence: 74%
See 1 more Smart Citation
“…An algorithm for intentional islanding of a power grid satisfying various islanding constraints was presented in [2], [3]. However the algorithm is not applicable to all networks and failed to keep the islands observable in some cases, as shown in the present paper.…”
Section: Introductionmentioning
confidence: 74%
“…Such a sectionalized system can then be restored gradually to normal operation once the fault is cleared thereby reducing the probability of a Grid blackout. The algorithm proposed in [2] and [3] is modified in this work for better observability of Islands and channel limit considerations are also incorporated. The original algorithm is explained briefly here and the modifications proposed are explained in the following section.…”
Section: (4)mentioning
confidence: 99%
“…This policy has remarkably improved the grid discipline over a period of time. Reliability of generating units from protection side can be improved by the installation of synchronized phasor measurement unit (PMU) for wide area measurement [19,20]. India has installed and successfully operated its first PMU unit system in April 2010 in Northern Region Load Dispatch Center (NRLDC).…”
Section: A Reliable Generationmentioning
confidence: 99%
“…In addition to the cost factor, different criteria are suggested for the proper allocation of PMUs in a given system. Network observability, state estimation accuracy and robustness present samples of such criteria [54][55][56][57][58][59][60].…”
Section: Integer Programming (Ip)mentioning
confidence: 99%