2022
DOI: 10.1109/tits.2020.3046696
|View full text |Cite
|
Sign up to set email alerts
|

Robust Energy Management of High-Speed Railway Co-Phase Traction Substation With Uncertain PV Generation and Traction Load

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
20
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 41 publications
(20 citation statements)
references
References 34 publications
0
20
0
Order By: Relevance
“…An optimal energy management model for CCTPSs is proposed in [40] with an economic saving point of view. Liu et al [41] presented a multistage robust model in which the uncertainties of PV and traction load have been considered. However, in references [40,41], the VUR is just taken into account as a constraint, but not as a goal.…”
Section: Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations
“…An optimal energy management model for CCTPSs is proposed in [40] with an economic saving point of view. Liu et al [41] presented a multistage robust model in which the uncertainties of PV and traction load have been considered. However, in references [40,41], the VUR is just taken into account as a constraint, but not as a goal.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Liu et al [41] presented a multistage robust model in which the uncertainties of PV and traction load have been considered. However, in references [40,41], the VUR is just taken into account as a constraint, but not as a goal. Table 1 provides a summary of the literature review.…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…Furthermore, a comprehensive framework was developed for the AI applications in high-speed rail transportation, considering operational efficiency and customer comfort criteria. Along with the aforementioned efforts, many other studies applied various AI-based methods, optimization, simulation, and other operations research techniques to address different decision problems and issues that are related to train operations, including energy and power sources [80][81][82][83][84][85][86][87][88][89][90][91][92][93][94][95][96], train speed control and trajectory control [97][98][99][100][101][102][103][104][105][106], timetable synchronization and optimization [107][108][109][110][111][112][113][114][115][116][117], as well as intelligent maintenance and prognostics [118][119][120][121][122][123]…”
Section: Figure 16 Iiot-enabled Technologies For Rail Transportationmentioning
confidence: 99%