2014
DOI: 10.1016/j.applthermaleng.2014.08.039
|View full text |Cite
|
Sign up to set email alerts
|

Root-cause analysis of burner tip failures in coal-fired power plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…Another solution should be taken by considering all parameters, mainly cost and thermal energy source. For instance, by using root cause analysis and first-principle design we come up with the idea to use a non-electric thermal heat exchanger inside the storage tank (V-04) [11]. This method also recommended for extracting geothermal energy from the oil wells [12].…”
Section: Introductionmentioning
confidence: 99%
“…Another solution should be taken by considering all parameters, mainly cost and thermal energy source. For instance, by using root cause analysis and first-principle design we come up with the idea to use a non-electric thermal heat exchanger inside the storage tank (V-04) [11]. This method also recommended for extracting geothermal energy from the oil wells [12].…”
Section: Introductionmentioning
confidence: 99%