2018
DOI: 10.1016/j.aei.2018.05.001
|View full text |Cite
|
Sign up to set email alerts
|

Scan-to-BIM for ‘secondary’ building components

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
30
0
3

Year Published

2018
2018
2021
2021

Publication Types

Select...
5
5

Relationship

1
9

Authors

Journals

citations
Cited by 67 publications
(33 citation statements)
references
References 17 publications
0
30
0
3
Order By: Relevance
“…Patraucean et al [28] also conducted research on the modeling method for the progressive status of a project through the BIM. Meanwhile, Adan et al [29] focused on the recognition of objects. After segmenting the point clouds corresponding to the walls of a building, a set of candidate objects was detected independently in the color and geometric spaces, and an original consensus procedure integrated both results to infer recognition.…”
Section: Existing Studies On Automated Progress Data Acquisitionmentioning
confidence: 99%
“…Patraucean et al [28] also conducted research on the modeling method for the progressive status of a project through the BIM. Meanwhile, Adan et al [29] focused on the recognition of objects. After segmenting the point clouds corresponding to the walls of a building, a set of candidate objects was detected independently in the color and geometric spaces, and an original consensus procedure integrated both results to infer recognition.…”
Section: Existing Studies On Automated Progress Data Acquisitionmentioning
confidence: 99%
“…These studies sought to enhance the quality monitoring, model checking and tracking of as-built design changes over the project's lifecycle. (Adán et al, 2018;Agapaki et al, 2018); Dietze et al, 2013;Franz et al, 2018;Stojanovic et al, 2018;Kalyan et al, 2016). Interoperability.…”
Section: Acknowledgmentsmentioning
confidence: 99%
“…Registration of credible, available BIM components is a possible means of responding to this difficulty. The concept of parametric 3D component registration emerged decades ago, for example in computer-aided design (CAD) surface fitting in reverse engineering (Varady et al, 1997), and has been practiced in modeling curved surfaces (e.g., Dimitrov et al, 2016), pipelines (e.g., Bosché et al, 2014;Nguyen and Choi, 2018), secondary elements on walls (e.g., Adán et al, 2018), and historic BIMs (e.g., Barazzetti, 2016). A well-known registration algorithm is the iterated closest point (ICP).…”
Section: Generation Of As-built Bims From 3d Point Cloudsmentioning
confidence: 99%