2016 IEEE International Parallel and Distributed Processing Symposium Workshops (IPDPSW) 2016
DOI: 10.1109/ipdpsw.2016.72
|View full text |Cite
|
Sign up to set email alerts
|

Scheduler for Inhomogeneous and Irregular CGRAs with Support for Complex Control Flow

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
3
1
1

Relationship

1
4

Authors

Journals

citations
Cited by 9 publications
(2 citation statements)
references
References 25 publications
0
2
0
Order By: Relevance
“…The optimized CDFG and the CGRA model are then fed into the scheduler (Step 7), which is based on list scheduling with additional constraints to cope with routing resources and inter-PE data transfers [13]. This approach produces very good results in short time [14].…”
Section: Application Scheduling and Cgra Configurationmentioning
confidence: 99%
See 1 more Smart Citation
“…The optimized CDFG and the CGRA model are then fed into the scheduler (Step 7), which is based on list scheduling with additional constraints to cope with routing resources and inter-PE data transfers [13]. This approach produces very good results in short time [14].…”
Section: Application Scheduling and Cgra Configurationmentioning
confidence: 99%
“…The reason is most likely the attraction criterion used during scheduling. Not all PEs are considered to place a node, but only PEs in the neighborhood of the PE to which the predecessing node was mapped [13]. Peaks can be observed for instances that have a longish structure.…”
Section: Scalability-tool Run-timementioning
confidence: 99%