Security-Constrained Unit Commitment Problem With Transmission Switching Reliability and Dynamic Thermal Line Rating

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
22
0

Year Published

2020
2020
2025
2025

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 42 publications
(22 citation statements)
references
References 19 publications
0
22
0
Order By: Relevance
“…It is important to say that the energy should be transferred in the distributed network considering the communication platform. The detailed data of the WT and tidal units represented in the AC network are taken from [24], [25]. Also, the electrical grid is provided based on the IEEE 24-bus test system and the data of the hub system have coincided with the proposed hub system in [24,26].…”
Section: Simulation Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…It is important to say that the energy should be transferred in the distributed network considering the communication platform. The detailed data of the WT and tidal units represented in the AC network are taken from [24], [25]. Also, the electrical grid is provided based on the IEEE 24-bus test system and the data of the hub system have coincided with the proposed hub system in [24,26].…”
Section: Simulation Resultsmentioning
confidence: 99%
“…The objective function of the grid can be defined based on reducing the operation cost of the active power of generators, start-up and shut-down cost for generators. All constraints of the electrical grid are followed in (21)-(32) in which the constraint (25) shows the active power balance between the generation and demand. The T t P variable is represented as the injected power from the electrical grid to the AC bus of AC network.…”
Section: ) Electrical Gridmentioning
confidence: 99%
“…The extra power of lines can be calculated based on the thermal balance equation. The extra power for each span of line is presented in (32). The extra power of reinforced line should be lower than the extra power calculated for each line span.…”
Section: Dlr Constraintsmentioning
confidence: 99%
“…This may result in results which are not much trustable by ignoring the weather conditions. In [22], the security constraint UC is solved incorporating the TS and reliability of circuit breakers. Due to the non-linear nature of the circuit breaker and its dependability on the number of switching, a linear model was developed to linearise the model.…”
Section: Literature and Background Surveymentioning
confidence: 99%
“…2 shows a piecewise linear approach through which the losses are linearised [16]. According to this, line losses in (21) and (22) are piecewise linearisable…”
Section: Linear Structure For Power Flow With Lossesmentioning
confidence: 99%