2014
DOI: 10.1504/ijlsm.2014.062329
|View full text |Cite
|
Sign up to set email alerts
|

Selecting a preventive maintenance scheduling method by using simulation and multi criteria decision making

Abstract: One of the major factors of competitive advantage in service and manufacturing systems is establishing a proper maintenance system .The productivity of the production line and equipment efficiency are among the significant points in most manufacturing companies which are directly related to their production style. Achieving the highest possible productivity improves the operations and functions of the line and finally increases the production volume. Various variables are effective on the productivity and effi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 39 publications
0
3
0
Order By: Relevance
“…Maintenance prioritization (Farhan & Fwa, 2009;Moazami et al, 2011;Taghipour et al, 2011) (Ouma et al, 2015) (Wakchaure & Jha, 2011) (Liu et al, 2012;Cafiso et al, 2002;Hankach et al, 2011;Trojan & Morais, 2012b) (Monte & de Almeida-Filho, 2016;de et al, 2015b) Resource Planning (Azadeh et al, 2013) Almeida et al, 2013) (Garmabaki et al, 2016;de Almeida., 2001;Liu & Frangopol, 2006) Maintenance Scheduling (Coulter et al, 2006;Eslami et al, 2014) ( Van et al, 2013) (Certa et al, 2013) (Almeida, A. T., 2012) Operational Level…”
Section: Expert Maintenance Systemsmentioning
confidence: 99%
“…Maintenance prioritization (Farhan & Fwa, 2009;Moazami et al, 2011;Taghipour et al, 2011) (Ouma et al, 2015) (Wakchaure & Jha, 2011) (Liu et al, 2012;Cafiso et al, 2002;Hankach et al, 2011;Trojan & Morais, 2012b) (Monte & de Almeida-Filho, 2016;de et al, 2015b) Resource Planning (Azadeh et al, 2013) Almeida et al, 2013) (Garmabaki et al, 2016;de Almeida., 2001;Liu & Frangopol, 2006) Maintenance Scheduling (Coulter et al, 2006;Eslami et al, 2014) ( Van et al, 2013) (Certa et al, 2013) (Almeida, A. T., 2012) Operational Level…”
Section: Expert Maintenance Systemsmentioning
confidence: 99%
“…Lack of preventive maintenance increases failure rates, which increases maintenance costs (Alimian et al 2020 ). As pointed by Eslami et al ( 2014 ), such decision involves a trade-off between the cost of maintenance execution and the cost avoidance achieved through the activity continuity and overall system failure reduction.…”
Section: Introductionmentioning
confidence: 99%
“…Moreover, fuzzy logic is used as a suitable strategy for analyzing systems that lack previous records in maintenance (Biswas and Zaman, 2019). And so, these conditions can be decided by forming a fuzzy expert system (Nasruddin et al, 2017) and fuzzy inferences in order to determine the remaining life of such equipment (Hu et al, 2018) or the best maintenance policy (Eslami et al, 2014). Also, the approach is used to determine the RCM strategies (Felecia, 2014), seeming to be applicable in one-shot devices.…”
mentioning
confidence: 99%