Semmering Base Tunnel – Design and construction of the shaft head caverns under difficult conditions

Abstract: In contract SBT1.1 of the Semmering Base Tunnel, the single‐track main tunnels are being driven from the portal in Gloggnitz and from a temporary intermediate starting point in Göstritz. The temporary intermediate starting point in Göstritz is being constructed in order to reduce the risk to the tunnel construction time for the Graßberg‐Schlagl fault system. During the construction phase, the contractor developed optimisations of the planned logistics concept for the intermediate access point in Göstritz, whic… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…Consequently, the shaft head caverns were replanned and the shaft axes moved 15 respectively 30 m to the north. This is described in detail in [4].…”
Section: Overview Of the Göstritz Intermediate Construction Accessmentioning
confidence: 99%
See 1 more Smart Citation
“…Consequently, the shaft head caverns were replanned and the shaft axes moved 15 respectively 30 m to the north. This is described in detail in [4].…”
Section: Overview Of the Göstritz Intermediate Construction Accessmentioning
confidence: 99%
“…The original tender concept envisaged two shafts with a diameter of 9 and 7 m respectively; a larger main shaft for logistical supplies, mucking, fresh air ventilation and a smaller secondary shaft for transportation of machinery and exhaust air ventilation. In this case the concept for the Sedrun intermediate construction access at the Gotthard Base Tunnel construction site [4] was used for orientation during the design phase. The alternative construction proposal introduced and implemented by the construction company was elaborated primarily due to construction logistics constraints Für die logistische Versorgung im Förderbetrieb stehen je Schacht drei unabhängige Seilwindenanlagen zur Ver-(Figure 7).…”
Section: Shaft Logisticsmentioning
confidence: 99%