2019
DOI: 10.1061/(asce)cf.1943-5509.0001269
|View full text |Cite
|
Sign up to set email alerts
|

Settlement Characteristics of Jacked Box Tunneling underneath a Highway Embankment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
19
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 35 publications
(20 citation statements)
references
References 44 publications
1
19
0
Order By: Relevance
“…In recent years, geological hazards happened frequently [1][2][3], and with the development of rock engineering [4,5] and civil engineering [6][7][8][9], a substantial number of tunnel projects have been constructed in complex geological areas as western development strategies have been implemented in China [10][11][12][13][14][15][16]. e construction of loess tunnels has become a focus of the tunnel field, and many relevant practical experience and theoretical results have been obtained [17][18][19][20][21][22][23].…”
Section: Introductionmentioning
confidence: 99%
“…In recent years, geological hazards happened frequently [1][2][3], and with the development of rock engineering [4,5] and civil engineering [6][7][8][9], a substantial number of tunnel projects have been constructed in complex geological areas as western development strategies have been implemented in China [10][11][12][13][14][15][16]. e construction of loess tunnels has become a focus of the tunnel field, and many relevant practical experience and theoretical results have been obtained [17][18][19][20][21][22][23].…”
Section: Introductionmentioning
confidence: 99%
“…is paper selects tuffaceous sandstone for freeze-thaw cycles and mechanical tests. To eliminate the influence of rock sample dispersion on tests, the following measures were taken: (1) rock samples from the same stratum were selected for comparative tests; (2) samples that were defective and clearly different were eliminated; and (3) the P-wave velocity of rock samples was measured, and those with similar velocity (i.e., within the range of 4200-4600 m/s) were selected for the test. e screening process of rock samples is presented in Figure 2.…”
Section: Methodsmentioning
confidence: 99%
“…With the active development of China's economy and ongoing implementation of Western Development Policy, the number of tunnels and other traffic projects under conditions of high altitude, cold, and glacial accumulation deposits continue to increase [1][2][3]. As a result, new problems have arisen in highway tunnel engineering [4,5].…”
Section: Introductionmentioning
confidence: 99%
“…Due to the particularity of the tunnel, many problems cannot be expressed in the 2D CAD drawings. However, during the construction stage, many problems in the tunnel design are discovered [50][51][52]. Collision inspection can avoid problems such as tunnel bolts collision and pipeline crossing during construction, which greatly improves the construction efficiency [53][54][55] Therefore, collision inspection before tunnel construction is a critical task in tunnel design.…”
Section: Collision Inspectionmentioning
confidence: 99%