Short‐circuit‐constrained transmission expansion planning with bus splitting flexibility

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
17
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 22 publications
(17 citation statements)
references
References 32 publications
0
17
0
Order By: Relevance
“…in year t. In the existing study, the following update equation is used to calculate each element of the bus impedance matrix after the transmission lines are added [7,8]:…”
Section: Conventional Methods For the Bus Impedance Updatementioning
confidence: 99%
See 3 more Smart Citations
“…in year t. In the existing study, the following update equation is used to calculate each element of the bus impedance matrix after the transmission lines are added [7,8]:…”
Section: Conventional Methods For the Bus Impedance Updatementioning
confidence: 99%
“…In order to improve the computational speed in the process of applying the above equations, the existing studies [7,8] assume that the off-diagonal elements of the bus impedance matrix are negligibly smaller than the diagonal elements ( Z old i,j Z old i,i ), and the diagonal elements of the bus impedance matrix before the update are significantly smaller than the impedance of the new transmission lines that will be connected to the buses ( Z old…”
Section: Conventional Methods For the Bus Impedance Updatementioning
confidence: 99%
See 2 more Smart Citations
“…So, the expansion decisions are here‐and‐now decisions since they do not depend on any scenario realisation [29]. Equation (11) shows that for given time period t, if the characteristics of two scenarios Se and Se are indiscernible from each other for time interval 1 to t , then the generation expansion plans of these two scenarios for time period t should also be exactly same Ut,se,i=Ut,se,i1emnormal∀Se,normal∀SeW)(Se,t,normal∀tT Equation (12) shows that once a generating unit is installed, the corresponding decision variable should take 1 [30]. This means that the generating unit cannot be removed after installation Zt1,iZt,i1emnormal∀iA1,A2,normal∀tT …”
Section: Model Formulationmentioning
confidence: 99%