“…So, the expansion decisions are here‐and‐now decisions since they do not depend on any scenario realisation [29]. Equation (11) shows that for given time period t, if the characteristics of two scenarios Se and are indiscernible from each other for time interval 1 to t , then the generation expansion plans of these two scenarios for time period t should also be exactly same Equation (12) shows that once a generating unit is installed, the corresponding decision variable should take 1 [30]. This means that the generating unit cannot be removed after installation …”