Short-term scheduling of hydro-based power plants considering application of heuristic algorithms: A comprehensive review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
26
0
1

Year Published

2017
2017
2021
2021

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 84 publications
(27 citation statements)
references
References 102 publications
0
26
0
1
Order By: Relevance
“…Power flow calculations are made using PowerWorld simulator [45]. Power flow calculations results show possible congestion on one 110-kV transmission line (see Figure 7) in hours 10,11,12,13,14,17,18,19, and 23, as shown in Figure 12. In the next step, it is necessary to calculate the ATC values of the critical line in the case without the WPP production.…”
Section: Results Of the Second Optimization Stagementioning
confidence: 99%
“…Power flow calculations are made using PowerWorld simulator [45]. Power flow calculations results show possible congestion on one 110-kV transmission line (see Figure 7) in hours 10,11,12,13,14,17,18,19, and 23, as shown in Figure 12. In the next step, it is necessary to calculate the ATC values of the critical line in the case without the WPP production.…”
Section: Results Of the Second Optimization Stagementioning
confidence: 99%
“…2 Whereas a review on heuristics-like approaches with a focus on hydro-dominated systems is provided in Ref. 25 Additionally, techniques and strategies for improving the convergence and general performance of the BD are discussed in Ref. 5 In this work, we exploit the structure of the two-stage stochastic hydrothermal UC firstly by applying the BD.…”
Section: Referencesmentioning
confidence: 99%
“…The probability function operates to solve the optimal value of the compact pigeon-inspired optimization (CPIO) algorithm, and uses a real-valued prototype vector to generate each candidate solution. The algorithm has been tested on multiple continuous multi-modal functions as well as the short-term power generation of cascade hydropower stations [35][36][37].…”
Section: Introductionmentioning
confidence: 99%