2017
DOI: 10.4324/9781315243023
|View full text |Cite
|
Sign up to set email alerts
|

Six Sigma: SPC and TQM in Manufacturing and Services

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

1
54
0
3

Year Published

2017
2017
2023
2023

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 53 publications
(58 citation statements)
references
References 0 publications
1
54
0
3
Order By: Relevance
“…Other planning tools currently used by ERIs include classic SWOT analyses (Hill and Westbrook, 1997;Humphrey, 2005), stakeholder engagement (Herremans et al, 2016), sigma six (Tennat, 2001), PmBok (PMI, 2013, verification and validation engineering, commissioning processes, and the like (Bartocci and Picciaia, 2013). There are often heated debates on the types of software and specific reporting analytics used in project management, but the corresponding variance is approximatively ∼10% among these tools (T. Beasley, pers.…”
Section: Programmatic Tools To Foster the Development Of Public Privamentioning
confidence: 99%
“…Other planning tools currently used by ERIs include classic SWOT analyses (Hill and Westbrook, 1997;Humphrey, 2005), stakeholder engagement (Herremans et al, 2016), sigma six (Tennat, 2001), PmBok (PMI, 2013, verification and validation engineering, commissioning processes, and the like (Bartocci and Picciaia, 2013). There are often heated debates on the types of software and specific reporting analytics used in project management, but the corresponding variance is approximatively ∼10% among these tools (T. Beasley, pers.…”
Section: Programmatic Tools To Foster the Development Of Public Privamentioning
confidence: 99%
“…As result to the natural drifting that can occur in the process execution, it is observed that it over time the process mean drifts from the target by 1.5-standard deviation [2]: therefore, the long-term standard deviation of the process will be greater than the observed one on the short-term [22]. In other words, when a process fits on "6 sigma" between the process mean and one of the nearest specification limit in a short-term data variation, it will be "4.5 sigma" in the long term fit.…”
Section: Six Sigma As a Measurement Systemmentioning
confidence: 99%
“…In other words, when a process fits on "6 sigma" between the process mean and one of the nearest specification limit in a short-term data variation, it will be "4.5 sigma" in the long term fit. So the six sigma process in fact corresponds to "4.5 sigma" referred to as "6 sigma" minus the 1.5-sigma shift [22]. The long-term data variation, on the other hand, contains common cause variations and special cause variations [23].…”
Section: Six Sigma As a Measurement Systemmentioning
confidence: 99%
“…Six Sigma achieves this by focusing on the reduction of both defects and non-value added activities. Its importance has been increased recently and it has serious effects on a company's success (Tennant, 2001). Therefore, in this study, six sigma has been chosen as a quality improvement philosophy to solve the problems in production system of a pipe application.…”
Section: Introductionmentioning
confidence: 99%