2018
DOI: 10.3390/s18072304
|View full text |Cite
|
Sign up to set email alerts
|

Smart Meter Data Collection Using Public Taxis

Abstract: The advent of wireless sensor networks (WSN) has opened up an array of applications. Due to the ad-hoc nature of WSN and the small size of wireless nodes, multiple system configurations are possible. In order to collect data from WSN, some systems utilize static nodes with a network setup that consists of multiple relays to facilitate the dissemination of data to a gateway. Other WSN architectures consist of a mixture of static and mobile nodes. Mobile nodes are able to collect data from the WSN when in close … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 14 publications
0
2
0
Order By: Relevance
“…Energy measurements as frequent as in urban areas may not be feasible but it will be anyway a considerable improvement compared to the MMR case, currently adopted in almost all rural areas. Moreover, in the data mule solution, UAVs can be easily moved through different environments, but different moving objects can be also employed for this purpose, such as cars, taxis, and busses, as has been already proposed in other data communication initiatives [ 77 , 78 , 79 , 80 ].…”
Section: Possible Smart Metering System Evolutionmentioning
confidence: 99%
“…Energy measurements as frequent as in urban areas may not be feasible but it will be anyway a considerable improvement compared to the MMR case, currently adopted in almost all rural areas. Moreover, in the data mule solution, UAVs can be easily moved through different environments, but different moving objects can be also employed for this purpose, such as cars, taxis, and busses, as has been already proposed in other data communication initiatives [ 77 , 78 , 79 , 80 ].…”
Section: Possible Smart Metering System Evolutionmentioning
confidence: 99%
“…In recent years, due to the large-scale creation of high-voltage posts in several parts of the country, an increase in the number of electricity market automated meters as well as the need for constant and rapid monitoring of energy in the industry, the activity of the office of the electricity market in regional power companies has become more important than the past [1]. Installed meters in all posts should be measured and read daily and the data required by the appropriate telecommunication platform should be sent to the electricity market office in the regional electricity companies [2]. The office should also submit a daily report of its processed data to the Iranian power grid.…”
Section: Introductionmentioning
confidence: 99%