2020
DOI: 10.1016/j.egyr.2020.03.015
|View full text |Cite
|
Sign up to set email alerts
|

Solar PV energy system in Malaysian airport: Glare analysis, general design and performance assessment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
29
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 61 publications
(29 citation statements)
references
References 18 publications
0
29
0
Order By: Relevance
“…According to the Malaysian Investment Development Authority (MIDA), thriving RE technologies in Malaysia include solar energy, hydroelectric and biomass. However, compared to most RE technologies, recent developments in solar photovoltaic (PV) systems have led to its phenomenal growth in Malaysia and across nations ( Sreenath et al., 2020a , 2020b ). Malaysia experiences hot and humid weather with a generous amount of rainfall all year round due to its geographic location.…”
Section: Introductionmentioning
confidence: 99%
“…According to the Malaysian Investment Development Authority (MIDA), thriving RE technologies in Malaysia include solar energy, hydroelectric and biomass. However, compared to most RE technologies, recent developments in solar photovoltaic (PV) systems have led to its phenomenal growth in Malaysia and across nations ( Sreenath et al., 2020a , 2020b ). Malaysia experiences hot and humid weather with a generous amount of rainfall all year round due to its geographic location.…”
Section: Introductionmentioning
confidence: 99%
“…Inverters transform the solar modules' DC power output into AC type. 14 Today the inverters are specifically equipped for solar power plants. They must have advanced effectiveness of 98.0% or more, a lesser current harmonic alteration of 3% or less, and must comply with IEC 61,683 standard.…”
Section: Description Of Grid-connected Rooftop Solar Power Plantmentioning
confidence: 99%
“…Mohanty et al, 2019 assessed the architecture, development, and performance of one MW ongrid solar power production plant at Khordha, Odisha. The plant's total power is about 14,16,200 kWh in 2019, with an annual performance ratio of 80% and CUF of 16.17%, having a payback period of about eight years. This will support inefficient designing and development of new grid-interactive systems in the future.…”
Section: Introductionmentioning
confidence: 99%
“…Energy generation can be expressed as daily, monthly or yearly. Yearly energy generation is calculated using equation 1 [4,26].…”
Section: Energy Generationmentioning
confidence: 99%
“…B. Prasad et al [25] explained the design procedure of a 12.4 kWp grid-connected PV power plant using the PVsyst software. S. Sreenath et al [26] analyzed the technical performance of the 20 MWp PV power plant proposed to be installed at Kuantan Airport in Malaysia, taking into account the glare occurrence using SolarGis software. It was predicted that the proposed system generates 26304…”
Section: Introductionmentioning
confidence: 99%