Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic

Abstract: MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production orders in the sense that the first and the last product produced in a period are determined by the model. We solve a model which is applicable to general bill-of-material structures and which includes minimum lead times of one period and multi-period setup carry-overs. Our algorithm solves 1 a series of mixed-integer linear programs in an iterative so-cal… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
88
0
23

Year Published

2009
2009
2022
2022

Publication Types

Select...
5
4

Relationship

1
8

Authors

Journals

citations
Cited by 171 publications
(111 citation statements)
references
References 28 publications
0
88
0
23
Order By: Relevance
“…As for the heuristics-based approaches, Sahling et al (2009) propose a new algorithm to solve the MLCLSP as a big bucket problem, allowing to produce any number of products within a period, however, partial sequencing of the orders is solved by determining the release of the first and last orders in each period. Helber and Sahling (2010) apply the same fix-and-optimise heuristics as it provides a flexible and most efficient known solution for the MLCLSP.…”
Section: Production Planning In Multi-stage Systemsmentioning
confidence: 99%
“…As for the heuristics-based approaches, Sahling et al (2009) propose a new algorithm to solve the MLCLSP as a big bucket problem, allowing to produce any number of products within a period, however, partial sequencing of the orders is solved by determining the release of the first and last orders in each period. Helber and Sahling (2010) apply the same fix-and-optimise heuristics as it provides a flexible and most efficient known solution for the MLCLSP.…”
Section: Production Planning In Multi-stage Systemsmentioning
confidence: 99%
“…Therefore, we use an adapted version of the flexible Fix-and-Optimize heuristic proposed by Helber and Sahling (2010) as it leads to high-quality solutions for the multilevel version of the deterministic CLSP, see also Sahling et al (2009) andSahling (2010).…”
Section: Formulation Of the Sclsp-plamentioning
confidence: 99%
“…The approach is somewhat similar to the hybrid method presented in this paper although it has no adaptiveness or randomness builtin, instead Sahling et al (2009) consider a large number of predetermined subproblems and optimize over all of them. For some comparisons see for instance Jans & Degraeve (2007) or Buschkühl et al (2010).…”
Section: Introductionmentioning
confidence: 99%
“…In the multi-period carry-over variant Sahling et al (2009) present a fixand-optimize heuristic that repeatedly solves a series of subproblems with a MIP solver. The approach is somewhat similar to the hybrid method presented in this paper although it has no adaptiveness or randomness builtin, instead Sahling et al (2009) consider a large number of predetermined subproblems and optimize over all of them.…”
Section: Introductionmentioning
confidence: 99%