Solving a Multi-resource Partial-Ordering Flexible Variant of the Job-Shop Scheduling Problem with Hybrid ASP

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
3

Relationship

1
6

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 14 publications
0
3
0
Order By: Relevance
“…2021) and multi-shot solving (Francescutto et al . 2021) by clingo [DL] to tackle real-world scheduling problems evaluate threshold values on DL variables and perform optimization by means of common statements of clingo rather than minimizing the value of a DL variable like in Listing 4. Applying a similar approach can be advantageous in our future work as it may potentially improve computational efficiency as well as solution quality further and is even a necessity to switch from the makespan as optimization objective to tardiness w.r.t.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…2021) and multi-shot solving (Francescutto et al . 2021) by clingo [DL] to tackle real-world scheduling problems evaluate threshold values on DL variables and perform optimization by means of common statements of clingo rather than minimizing the value of a DL variable like in Listing 4. Applying a similar approach can be advantageous in our future work as it may potentially improve computational efficiency as well as solution quality further and is even a necessity to switch from the makespan as optimization objective to tardiness w.r.t.…”
Section: Discussionmentioning
confidence: 99%
“…2019), lab resource allocation (Francescutto et al . 2021), and medical treatment planning (Dodaro et al . 2021), pointing out the general attractiveness of ASP for modeling and solving scheduling problems.…”
Section: Introductionmentioning
confidence: 99%
“…The Workspace for the project can be divided into 6 categories according to the contents and purposes of the occupied objects: component space, manpower space, equipment space, hazard space, protection space and temporary space [24] . Workspace interference refers to the situation where different workspaces occupy each other in actual scenes.…”
Section: (A) the Definition Of Disassembling Workpacementioning
confidence: 99%
“…The tests conducted in Francescutto et al [24] Multi-resource Li et al [25] Reinforcement Feng et al [26] deep reinforcement learning (RL) method…”
Section: Introductionmentioning
confidence: 99%
“…A number of recent ASP applications feature difference constraints for problems that involve timing constraints (Eiter et al 2021;El-Kholany and Gebser 2020;Francescutto, Schekotihin, and El-Kholany 2021;Abels et al 2019). For unrestricted integer constraints, clingcon (Banbara et al 2017) or other constraint ASP systems (Balduccini and Lierler 2017;Lierler 2014) can be used.…”
Section: Introductionmentioning
confidence: 99%