2011
DOI: 10.2172/1027888
|View full text |Cite
|
Sign up to set email alerts
|

SPAR-H Step-by-Step Guidance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
13
0

Year Published

2014
2014
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 14 publications
(13 citation statements)
references
References 5 publications
0
13
0
Order By: Relevance
“…The failure models of the make-up systems take into account human failure events, those function events which require human action were quantified following step by step standardized plant analysis risk-human reliability analysis (SPAR-H) methodology [10] for quantifying human failure events (HFE). A number of performance shaping factors (PSF) are taken in to consideration.…”
Section: Accident Sequence Quantificationmentioning
confidence: 99%
“…The failure models of the make-up systems take into account human failure events, those function events which require human action were quantified following step by step standardized plant analysis risk-human reliability analysis (SPAR-H) methodology [10] for quantifying human failure events (HFE). A number of performance shaping factors (PSF) are taken in to consideration.…”
Section: Accident Sequence Quantificationmentioning
confidence: 99%
“…For the application of the methodology, we considered only PSFs for action 10,29 . Table 8 presents the data used in this study.…”
Section: Case Studymentioning
confidence: 99%
“…If the decision‐maker concludes that there are benefits or inappropriate measures, then the appropriate measures for “Work processes” PSF should be considered. It is worth highlighting that “Work processes” 29 are beyond problem identification and resolution, encompassing organizational and management issues.…”
Section: Case Studymentioning
confidence: 99%
“…To study the effect of TP on human mental workload, it is important to determine whether the AT of a task can successfully come to meet with the RT 14 . In the field of studying NPPs, the RT among a group crews or operators are varying significantly, 15 and we argue that the RT in a specific task means that operators will be able to keep up with a task within the RT .…”
Section: Introductionmentioning
confidence: 99%