2020
DOI: 10.1016/j.ejor.2019.12.005
|View full text |Cite
|
Sign up to set email alerts
|

Spare parts or buffer? How to design a transfer line with unreliable machines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(1 citation statement)
references
References 49 publications
0
1
0
Order By: Relevance
“…e authors in [18] developed a method to analyze the complex tradeoff between the preventive maintenance and the buffer's contribution to system performance, considering a two-machine continuous manufacturing system with a finite capacity buffer. e authors in [19] analyzed the tradeoff between buffer capacity, spare parts inventory, and throughput for a two-stage production system with buffers and established a discrete-time Markov chain for two different situations. e numerical examples showed that the effect of a spare part on the efficiency of a transfer line was much greater than the effect of additional buffer places.…”
Section: Introductionmentioning
confidence: 99%
“…e authors in [18] developed a method to analyze the complex tradeoff between the preventive maintenance and the buffer's contribution to system performance, considering a two-machine continuous manufacturing system with a finite capacity buffer. e authors in [19] analyzed the tradeoff between buffer capacity, spare parts inventory, and throughput for a two-stage production system with buffers and established a discrete-time Markov chain for two different situations. e numerical examples showed that the effect of a spare part on the efficiency of a transfer line was much greater than the effect of additional buffer places.…”
Section: Introductionmentioning
confidence: 99%