2022
DOI: 10.1016/j.engfailanal.2022.106301
|View full text |Cite
|
Sign up to set email alerts
|

Statistics and construction methods for deep TBM tunnels with high geostress: A case study of Qinling Tunnel in Hanjiang-Weihe River Diversion Project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 17 publications
(4 citation statements)
references
References 20 publications
0
4
0
Order By: Relevance
“…For instance, Iran's Zagros water conveyance tunnel experienced an 8-month shutdown due to incidents of jamming and collapses caused by fault zones with water-bearing gouges and squeezing formations [9]. China's Qinling Diversion Tunnel encountered 159 instances of rock bursts attributed to the high-stress surrounding rock [10]. Similarly, Turkey's Water Diversion Tunnel faced 18 occurrences of TBM jamming due to squeezing formations, which took 192 days to resolve [11].…”
Section: Introductionmentioning
confidence: 99%
“…For instance, Iran's Zagros water conveyance tunnel experienced an 8-month shutdown due to incidents of jamming and collapses caused by fault zones with water-bearing gouges and squeezing formations [9]. China's Qinling Diversion Tunnel encountered 159 instances of rock bursts attributed to the high-stress surrounding rock [10]. Similarly, Turkey's Water Diversion Tunnel faced 18 occurrences of TBM jamming due to squeezing formations, which took 192 days to resolve [11].…”
Section: Introductionmentioning
confidence: 99%
“…At the same time, with the development of new technologies such as big data, Internet, artificial intelligence, blockchain, and supercomputing, the traditional tunnel structure safety performance sensing and control need to be deeply integrated with intelligent technology. The application of holographic perception, instant communication, artificial intelligence, big data, cloud computing, Internet of things, and other technologies in the field monitoring of tunnel structure mechanical characteristics, model test, numerical simulation, and safety performance sensing and control needs to be further developed [12][13][14][15][16].…”
Section: Introductionmentioning
confidence: 99%
“…Compared with the traditional drilling and blasting method, a TBM has the characteristics of being fast, being efficient, quality assurance, and high-level safety [1,2]. This provides advanced equipment and methods for the construction of long-distance water conveying tunnels under complex geological conditions [3,4], especially in conditions of tunnel with high geostress [5]. Meanwhile, the precast segmental lining of a TBM water conveyance tunnel provides regular sections, which is convenient for constructing the internal concrete lining subject to high internal water pressure [6].…”
Section: Introductionmentioning
confidence: 99%
“…Based on the above discussion, this study is rare in addressing safety-risk assessment by the fuzzy evidence reasoning method for TBM construction of a hydraulic tunnel with the features of long distance passed through different geological conditions [5,11,31]. In this paper, the evaluation indices of construction safety-risk with the characteristics of TBM tunnel construction were first analyzed while an evaluation index system was built.…”
Section: Introductionmentioning
confidence: 99%