Status of the JWST optical telescope element

Abstract: Significant progress has been made in the development of the Optical Telescope Element (OTE) for the James Webb Space Telescope (JWST) Observatory. All of the mirror assemblies are complete and delivered. The composite Primary Mirror Backplane Support Structure (PMBSS) has completed assembly and in Static Load testing. All the deployment mechanisms have completed their qualification programs. This paper will discuss the current status of all the OTE components and the plan forward to completion.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2014
2014
2020
2020

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 15 publications
(8 citation statements)
references
References 0 publications
0
8
0
Order By: Relevance
“…With all segments deployed, iterative alignment of the PM took place using the PG and COCOA systemsa moving target during cooldown, but good practice for using all of the analysis tools with 18 segments for the first time, after the twosegment Pathfinder experience. In the latter stages of the cooldown, two important Thermal Distortion/Figure Drift tests were executed 27,28 tracking the PM figure vs. temperature against model predictions; results are described below.…”
Section: Cooldown (Days 9-40)mentioning
confidence: 99%
See 3 more Smart Citations
“…With all segments deployed, iterative alignment of the PM took place using the PG and COCOA systemsa moving target during cooldown, but good practice for using all of the analysis tools with 18 segments for the first time, after the twosegment Pathfinder experience. In the latter stages of the cooldown, two important Thermal Distortion/Figure Drift tests were executed 27,28 tracking the PM figure vs. temperature against model predictions; results are described below.…”
Section: Cooldown (Days 9-40)mentioning
confidence: 99%
“…The above were all pre-planned activities; there was also a significant period of ad hoc investigation, before and after the OTE thermal balance, of instabilities that had been observed in the PM figure 28 . These investigations are also discussed in the "Results" section below.…”
Section: Cryo-stable Operations (Days 41-75)mentioning
confidence: 99%
See 2 more Smart Citations
“…Once completed the eighteen Primary Mirror Segment Assemblies (PMSAs) are mounted to the primary mirror backplane support structure, a graphite/epoxy composite truss structure. 4 All mirrors are coated with protected gold. The telescope will be assembled and instruments installed at NASA Goddard Space Flight Center clean room facility.…”
Section: Introductionmentioning
confidence: 99%