2018
DOI: 10.1016/j.jmsy.2018.10.002
|View full text |Cite
|
Sign up to set email alerts
|

Stochastic optimal control of random quality deteriorating hybrid manufacturing/remanufacturing systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 27 publications
(4 citation statements)
references
References 27 publications
0
4
0
Order By: Relevance
“…To the best of our knowledge, many studies have focused on issues related to production decisions in a hybrid remanufacturing/manufacturing system. Assuming the remanufactured product is equivalent to the original manufactured product and thus sold for the same price to the same market, most researchers studied production decisions of the manufacturing/remanufacturing hybrid system [14][15][16] and operation decisions of the closed-loop supply chain [17][18][19].…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…To the best of our knowledge, many studies have focused on issues related to production decisions in a hybrid remanufacturing/manufacturing system. Assuming the remanufactured product is equivalent to the original manufactured product and thus sold for the same price to the same market, most researchers studied production decisions of the manufacturing/remanufacturing hybrid system [14][15][16] and operation decisions of the closed-loop supply chain [17][18][19].…”
Section: Literature Reviewmentioning
confidence: 99%
“…The remanufacturable returns are shipped to the remanufacturing center, and the non-remanufacturable returns are disposed and would not be processed in the following operation activities. That is, only a certain percentage of returns are suitable for remanufacturing [15,16,31]. Moreover, after remanufacturing activities, the remanufactured products are used to satisfy the customers' demand of the secondary market.…”
Section: Problem Description and Assumptionmentioning
confidence: 99%
See 1 more Smart Citation
“…For example, [1] supplied a framework to make a robust scheduling problem for an institution. Other examples were presented in the facility location problem by [2], in the discrete time/cost trade-off problem by [3], and in random quality deteriorating hybrid manufacturing by [4].…”
Section: Introductionmentioning
confidence: 99%