2016
DOI: 10.1109/tpwrs.2016.2587999
|View full text |Cite
|
Sign up to set email alerts
|

Strategic Valuation of Smart Grid Technology Options in Distribution Networks

Abstract: -The increasing penetration of renewable distributed generation (DG) sources in distribution networks can lead to violations of network constraints. Thus, significant network reinforcements may be required to ensure that DG output is not constrained. However, the uncertainty around the magnitude, location and timing of future DG capacity renders planners unable to take fully-informed decisions and integrate DG at a minimum cost. In this paper we propose a novel stochastic planning model that considers investme… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
16
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
8

Relationship

1
7

Authors

Journals

citations
Cited by 44 publications
(16 citation statements)
references
References 26 publications
0
16
0
Order By: Relevance
“…Constraint ( 5) defines the binary nature of conventional investment decisions and, as explained above, is relaxed in all subproblems P S m . The temporal evolution of investments and storage assets decommissioning is described by Equations ( 6)- (20), where, specifically, (11) limits the number of reinforcements of lines across each scenario, (13) decides the amount of capacity to be built, and (17) limits the size of aggregate energy storage investments. Constraints (6)-(10) couple the investment state variables of the current problem in m with those of the parent node p(m), except for the root node in which case y I p(1) = 0.…”
Section: Mathematical Formulationmentioning
confidence: 99%
See 1 more Smart Citation
“…Constraint ( 5) defines the binary nature of conventional investment decisions and, as explained above, is relaxed in all subproblems P S m . The temporal evolution of investments and storage assets decommissioning is described by Equations ( 6)- (20), where, specifically, (11) limits the number of reinforcements of lines across each scenario, (13) decides the amount of capacity to be built, and (17) limits the size of aggregate energy storage investments. Constraints (6)-(10) couple the investment state variables of the current problem in m with those of the parent node p(m), except for the root node in which case y I p(1) = 0.…”
Section: Mathematical Formulationmentioning
confidence: 99%
“…In this context, smart grid technologies, such as energy storage, can constitute an option that can provide the required strategic flexibility, which will enable the network planner to hedge against the risk of stranded conventional assets by allowing the displacement and/or the deferral of large capital commitments on a conditional basis until the realization of a scenario suggests that they would be economically justified. This leads to the definition of the Option Value, which is the value of the total flexibility of energy storage, under the presence of uncertainty, and can be quantified as the net economic benefit accrued from its deployment in the system [11][12][13].…”
Section: Introductionmentioning
confidence: 99%
“…Currently, some IEDs work with the standard for the automation of IEC61850 electrical substations. This standard allows interoperability and good communications capacity ( Figure 5) [28]. The communications network is the backbone of the entire supervisory system in real time.…”
Section: Supervisory Systemmentioning
confidence: 99%
“…In addition, objectives like reliability, power quality and low (negative) environmental impact, system stability, energy efficiency and customer satisfaction can also be considered in SDN problem formulation. The SDN planning problems have been classified as follows [15,17,24,25].…”
Section: Futuristic Sdn Planning: Aim and Scope Of Workmentioning
confidence: 99%