2022
DOI: 10.55893/epsilon.v20i2.95
|View full text |Cite
|
Sign up to set email alerts
|

Studi Penambahan Gardu Sisipan Tipe Tiang untuk Mengatasi Beban Lebih di PT PLN (PERSERO) Area Cianjur Rayon Mande

Abstract: In the distribution system, blackouts caused by excessive loads cause losses for both consumers and electricity providers. Based on this, it is necessary to analyze the addition of distribution substations using an accurate methodology so that when applied it can be a solution to the need for electrical energi. Several stages of the method are determining the specifications of each component, calculating the optimal capacity of each component, measuring the voltage value contained in the panel and the primary … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 9 publications
0
0
0
1
Order By: Relevance
“…Kerugian daya tersebut dapat meningkatkan biaya operasional PT. PLN (Persero) dan mempengaruhi kualitas layanan listrik yang diberikan kepada masyarakat [2].…”
Section: Pendahuluanunclassified
“…Kerugian daya tersebut dapat meningkatkan biaya operasional PT. PLN (Persero) dan mempengaruhi kualitas layanan listrik yang diberikan kepada masyarakat [2].…”
Section: Pendahuluanunclassified