2018 China International Conference on Electricity Distribution (CICED) 2018
DOI: 10.1109/ciced.2018.8592047
|View full text |Cite
|
Sign up to set email alerts
|

Study on Rise of Transient Ground Potential Caused by Switching and Closing Operation in 330kV GIS Substation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…Electromagnetic interference (EMI) and electromagnetic compatibility (EMC) problems in power systems have been paid more and more attention [9]. Transient electromagnetic field generated during switching operation is one of the important sources of electromagnetic interference in substations [10]. The characteristics of the transient electric field generated by the switching operation of the substation can be understood by field measurement, including the characteristics of the transient field in time domain and frequency domain [11,12].…”
Section: Introductionmentioning
confidence: 99%
“…Electromagnetic interference (EMI) and electromagnetic compatibility (EMC) problems in power systems have been paid more and more attention [9]. Transient electromagnetic field generated during switching operation is one of the important sources of electromagnetic interference in substations [10]. The characteristics of the transient electric field generated by the switching operation of the substation can be understood by field measurement, including the characteristics of the transient field in time domain and frequency domain [11,12].…”
Section: Introductionmentioning
confidence: 99%