2021
DOI: 10.1177/0361198121994594
|View full text |Cite
|
Sign up to set email alerts
|

Study on Risks and Countermeasures of Shallow Biogas during Construction of Metro Tunnels by Shield Boring Machine

Abstract: With the intensive development of cities, the utilization of underground space has attracted more and more attention from industry and academia. Underground rail (metro) in cities has become an imperative mode for people in their daily lives. Meanwhile, the safety of rail tunnel construction has constantly been a challenging issue because of the presence of complex strata containing shallow biogas. Accidents in tunnel construction because of shallow biogas which resulted in massive casualties and property loss… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
10

Relationship

1
9

Authors

Journals

citations
Cited by 20 publications
(5 citation statements)
references
References 10 publications
0
5
0
Order By: Relevance
“…During jacking under water, there are possible combustible biological gases embedded into the rotten materials in the underwater shallow ground (20). The shallow biogas may penetrate the pipeline from the joints of the segmental lining, the head and the shield tail of the jacking machine, which could result in casualties and property loss (21)(22)(23)(24).…”
Section: Ventilation and Gas Monitoringmentioning
confidence: 99%
“…During jacking under water, there are possible combustible biological gases embedded into the rotten materials in the underwater shallow ground (20). The shallow biogas may penetrate the pipeline from the joints of the segmental lining, the head and the shield tail of the jacking machine, which could result in casualties and property loss (21)(22)(23)(24).…”
Section: Ventilation and Gas Monitoringmentioning
confidence: 99%
“…It is difficult to obtain the error parameters in the assembly of a shield tunnel [31]. The data from the construction party is often collected after the assembly [32], which generally includes the data after the segment is out of the shield tail and the deformation is stable.…”
Section: Field Measurement and Verificationmentioning
confidence: 99%
“…The demolition project poses higher risks compared to tunnel construction due to three key aspects. Firstly, the complexity of geological formations makes it difficult to ensure the safety of tunnel construction (Jiang et al, 2021). The surrounding rock of the tunnel has already been disturbed during the construction of the existing tunnel, which will be further disturbed during the demolition process (Bai et al, 2022).…”
Section: Introductionmentioning
confidence: 99%