2016
DOI: 10.1016/j.jngse.2015.09.017
|View full text |Cite
|
Sign up to set email alerts
|

Study on the replacement time of velocity string in production process in tight gas reservoir

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…To avoid liquid loading, a coiled tube is widely installed in the large tube with inner diameter (ID) of 75.9 mm at the early stage of production. More than 60 horizontal wells had installed coiled tubes in the Daniudi gas field in the last two years (Lai et al, 2016).…”
Section: Introductionmentioning
confidence: 99%
“…To avoid liquid loading, a coiled tube is widely installed in the large tube with inner diameter (ID) of 75.9 mm at the early stage of production. More than 60 horizontal wells had installed coiled tubes in the Daniudi gas field in the last two years (Lai et al, 2016).…”
Section: Introductionmentioning
confidence: 99%