SPE/ICoTA Well Intervention Conference and Exhibition 2021
DOI: 10.2118/204414-ms
|View full text |Cite
|
Sign up to set email alerts
|

Successful Gas Shut Off Operation using a Coiled Tubing Telemetry System: A Case History

Abstract: In a deviated well in Caspian Sea gas oil ratio (GOR) increased rapidly in 2017. The result was an oil rate decline with several choke backs to manage GOR build-up. After performing two production-logging jobs, it was confirm that 76% of the gas production was coming from four upper perforations. The main objective was to perform a Gas Shut off (GSO) treatment in two stages to reduce gas production by squeezing polymer into the formation and setting packers at 59° deviation inside 9-5/8 in. casing for temporar… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 12 publications
0
1
0
Order By: Relevance
“…Polymer gel systems are also applied as gas shutoff treatments in oil production wells (GSOOs). Potential sources of the unwanted gas production are gas coning in vertical wells, gas channeling that mainly originates from the gas cap [ 18 , 21 ], casing/tubing leak along the wellbore, and excess gas approaching the production well through a high-permeability layer with or without the existence of a barrier to the oil production zone ( Figure 2 ). Controlling the high mobility of natural gas during GSOO is necessary to ensure the well remains under production with an acceptable gas–oil ratio (GOR).…”
Section: Introductionmentioning
confidence: 99%
“…Polymer gel systems are also applied as gas shutoff treatments in oil production wells (GSOOs). Potential sources of the unwanted gas production are gas coning in vertical wells, gas channeling that mainly originates from the gas cap [ 18 , 21 ], casing/tubing leak along the wellbore, and excess gas approaching the production well through a high-permeability layer with or without the existence of a barrier to the oil production zone ( Figure 2 ). Controlling the high mobility of natural gas during GSOO is necessary to ensure the well remains under production with an acceptable gas–oil ratio (GOR).…”
Section: Introductionmentioning
confidence: 99%