Suction Anchor Installations for Deep Gulf of Mexico Applications

Abstract: A cost-effective solution to mooring problems in the deep and ultra-deep waters of the Gulf of Mexico (GoM) is the suction anchor system. Suction caisson foundations, also known as skirt piles and bucket foundations, have been used with success in the North Sea for major structures such as the Gullfaks C gravity platform (1989), the Europipe fixed steel jacket (1994), and the Snorre tension leg platform (1991). In the normally consolidated clays of the deep GoM, the new foundation concept is implemented with m… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
5
0
2

Year Published

1999
1999
2024
2024

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 12 publications
(7 citation statements)
references
References 0 publications
0
5
0
2
Order By: Relevance
“…A prova de carga não é necessária, pois já se tem o conhecimento da pressão de sucção e, portanto, a força transferida à estaca de sucção por ocasião de sua cravação. Os parâmetros monitorados são principalmente: posição, verticalidade, carga, sub pressão e a XX Congresso Brasileiro de Mecânica dos Solos e Engenharia Geotécnica IX Simpósio Brasileiro de Mecânica das Rochas IX Simpósio Brasileiro de Engenheiros Geotécnicos Jovens VI Conferência Sul Americana de Engenheiros Geotécnicos Jovens 15 a 18 de Setembro de 2020 -Campinas -SP profundidade de penetração (Sparrevik, 1998;Colliat et al, 1998;El -Gharbawy et al, 1999;Audibert et al, 2003).…”
Section: Instalação Das Estacas De Sucçãounclassified
“…A prova de carga não é necessária, pois já se tem o conhecimento da pressão de sucção e, portanto, a força transferida à estaca de sucção por ocasião de sua cravação. Os parâmetros monitorados são principalmente: posição, verticalidade, carga, sub pressão e a XX Congresso Brasileiro de Mecânica dos Solos e Engenharia Geotécnica IX Simpósio Brasileiro de Mecânica das Rochas IX Simpósio Brasileiro de Engenheiros Geotécnicos Jovens VI Conferência Sul Americana de Engenheiros Geotécnicos Jovens 15 a 18 de Setembro de 2020 -Campinas -SP profundidade de penetração (Sparrevik, 1998;Colliat et al, 1998;El -Gharbawy et al, 1999;Audibert et al, 2003).…”
Section: Instalação Das Estacas De Sucçãounclassified
“…With eight lines per site, the overall installation time averaged less than 20 days (including recovery of the suction piles, wires and buoys from the previous location), in which transit accounted for the highest percentage of time. It is worth also to mention that the pump-in over-pressure at time of retrieval was equal to about 2.5 times the installation suction under-pressure for pulling-out suction piles which were in place for six months [16,17]. -Mid 2001, the TOTAL FINA ELF's Girassol FPSO, the largest FPSO worldwide for the deepest field developed in west Africa to date, was anchored in 1400m of water off Angola.…”
Section: Development Of Suction Piles and Vlasmentioning
confidence: 99%
“…The phenomenon of "soil heave plug" was first discovered in 1980 at the site of the installation of suction caissons at the Gorm site, and its impact cannot be ignored [7]. On the one hand, the internal mud surface of the suction caisson because of the soil heave plug is brought into contact with the caisson roof in advance so that the suction caisson cannot penetrate to the designed depth [8,9]. It will lead to a decrease in the bearing capacity of caisson.…”
Section: Introductionmentioning
confidence: 99%