2003
DOI: 10.1134/1.1601643
|View full text |Cite
|
Sign up to set email alerts
|

Synchronization of parallel-connected plasma opening switches and switching the current to the load

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
5
0

Year Published

2005
2005
2013
2013

Publication Types

Select...
3

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…This Two POSs in the circuit with a double POS are syn chronized owing to inductive coupling between them [6]: they have a common electrode, and the grounded electrodes are connected at the POS input and output, L coup ≈ 5 nH. The POS voltage is determined by the energy density expended for the ion acceleration, i.e., plasma erosion.…”
Section: Circuit Diagram Of the Generator And Calculation Of Its Paramentioning
confidence: 99%
See 2 more Smart Citations
“…This Two POSs in the circuit with a double POS are syn chronized owing to inductive coupling between them [6]: they have a common electrode, and the grounded electrodes are connected at the POS input and output, L coup ≈ 5 nH. The POS voltage is determined by the energy density expended for the ion acceleration, i.e., plasma erosion.…”
Section: Circuit Diagram Of the Generator And Calculation Of Its Paramentioning
confidence: 99%
“…In experi ments [2,6] on the modeling of a liner load, a capaci tor that behaved as a liner during current switching was used as the load: at the beginning, it is a low imped ance load and, as a current continues flowing, the capacitor is charged to the POS voltage. The same is observed for a liner: the voltage across it appears upon its compression by the magnetic field of the current that flows through the liner.…”
Section: Circuit Diagram Of the Generator And Calculation Of Its Paramentioning
confidence: 99%
See 1 more Smart Citation
“…The total duration of the current pulse is ~40 µ s. In order to transmit such a long current pulse, we proposed filling the POS gap with plasma according to the program, i.e., injecting additional plasma as it undergoes erosion [2]. It was proposed in [3] that an isolating spark-gap switch be used between POS1 and the load (POS2) in order to increase the efficiency of the energy transfer to the liner.…”
Section: Introductionmentioning
confidence: 99%
“…A multimodular POS design was proposed in [3] for reducing the charge density transmitted through the POS. The design of the six-module POS of the MOL facility is shown in Fig.…”
Section: Introductionmentioning
confidence: 99%